2011 Progress Repor...
 
Notifications
Clear all

2011 Progress Reports

175 Posts
67 Users
0 Reactions
51.5 K Views
PD Shimmers
Posts: 199
(@pd-shimmers)
Reputable Member
Joined: 16 years ago

Tested 5 Fire Sticks in my front yard. Very windy so I was able to test my methods of keeping them straight. Tested the backup transmitter while I was at it. Sequencing 75% done. Needed all new as I have grown from 16 channels to 80.

To Do:
Change Tune to sign frequency (99.9 to 97.9)
Wire controller leads (Dlight acx16)
Create custom wire leads for 5 Mini Trees
Spin lights into super string for standard mega tree
Paint video screen base.

I dont need sleep do I?


Reply
toodle_pipsky
Posts: 1285
(@toodle-pipsky)
Noble Member
Joined: 19 years ago

Wow everyone’s so busy, as always can’t wait to see all the videos and pics of the end result (best part of it!).

Totally been out of the loop this year, but luckily I have stuff from previous years. So over the weekend dragged it all out to test and . . . . . lights computer is dead. **invented Christmas themed swear word**. Oh well, so I’ve ordered a new (well cheap second hand) computer so when it arrives back on track to test all the boards.

Hopefully after next weekend I’ll be setting up for the next month and sequencing. This will be the shortest time sequencing, so it will be interesting!

Good luck everyone!


Reply
Posts: 83
(@damo1271)
Estimable Member
Joined: 16 years ago

This is my first year at this so everything is being done from scratch. I hope I am not underestimating my timeframes...

On the weekend I tested my REN64s using my own PCB design. They work, which was positive. This gives me 192 channels. I've already designed a new modified ren64 PCB and might order more if I get time or need extra channels.
I have finished building 25x 4ch SSRs, again designed and built to my own specs. Waiting on 25 more PCBs to arrive, and extra parts. SSRs sort of tested - the 240V part works OK but havent interfaced to the REN64 yet!
Still need to build 50 rectifiers for the 240 LED strings to work on 240V SSRs.
Built 1x mini tree, 7 to go. Still need to get the welder out and build the last 4 frames.
Received a 10W RGB floodlight today and now need to modify it to work with vixen / renard controller and then will order more if it is successful.
Welded the wireframe for the Bethlehem star and now need to wire it up / hang lights.
Need to create a few Coro display items.
Have 50x 3W LED strobes to solder up - again waiting on my PCBs - which should be at the post office today.
Need to build the 6x RGB lights for the balcony (what I call my "linear arches")
I have sequenced 1.5 songs so far, more planned.
I still have to test the individual components all together.
Finally I have to put all this on the house and turn on the switch!


Reply
Posts: 214
(@chesterspot)
Estimable Member
Joined: 16 years ago

I got my REN64XC tested this weekend as well as a small 6 channel Halloween show built for proof of concept and testing purposes. My wife noticed that we now have dimming capabilities, there was a slight glimmer in her eye before she moved on to something else. It's the small things! I just need to build the REN24SS for my small tree I want to build and as many SSRez's that I can build. I found out that my hockey puck SSR's cannot be dimmed. While not a major issue, it would've been nice. They'll be for my C9 strings anyway which just line the yard. Anyway that's where I'm at which is good. Now I just need to re-sequence from last year and do another song or two.


Reply
N7XG
Posts: 480
 N7XG
Guest
(@n7xg)
Member
Joined: 19 years ago

Still only at one channel.


Reply
boyelroy11
Posts: 757
(@boyelroy11)
Prominent Member
Joined: 17 years ago

I'm finally moving into the house, so now I can start working on it, lol...

Not entirely true, I have built an additional Ren64 and 16 SSRez, rebuilt part of the Ren64 :roll:, built 2 RenSS24, and collected a bunch more lights. I've done some additional sequencing, but much more to do, lol.


Reply
OregonLights
Posts: 736
(@oregonlights)
Prominent Member
Joined: 16 years ago

First year with animation so very behind the curve.
1 - Ren24SS built, no enclosure yet
2 - Ren16SS built, no enclosures yet
2 - Ren48LSD built, no enclosures
1 - PC power supply converted, one to go.
24 - Super Strips 95% built.
1 - FM-02 transmitter purchased, no enclosure, no antenna or power supply yet
8 - Mini Trees with 2 colors, 0% (other than getting the lights from MITS)
1 - Cross (roughly planned to have some LEDs and C7's) 0%
No sequencing yet

My plan from here is to finish and install the Super Strips, then make the mini trees, then deploy the other static stuff and organize into channels and get to sequencing. My goal is for 5 songs sequenced. A couple may have to be pretty light in the complexity (i.e. heavy on the "random" functions).

My year has gone as follows:
Jan-Feb: Research LOR and then find DIYC. Make the milestone decision between the two. I have lots of reasoning behind this, but I obviously went with DIYC and have been very happy.
Feb-Mar: Scramble to learn about the DIYC world in time to make educated decisions on the group buys.
Apr-May: Blow by the budget but get lots of cool stuff in. Start to build boards and keep learning. Look at what I can sell to get the Cat-5, crimper and terminals I need. Blessed by the DIYC scholarship and get a real soldering iron for the first time in my life! (Planning donation to pay it forward this next spring if KY does it again!!)
May-Jun: Get serious about building boards, convert power supply.
July-Aug: Not sure where these two months went, enjoyed summer with my four daughters and wife (love you honey!).
Sept-Oct: Dang, really nervous about sequencing. Finish boards and Super Strips. Pull off a successful 5 channel dance party for my daughters birthday with my Ren16SS and learn the basics of Vixen. See some people's sequences for real songs...get scared!
Oct-Nov: Install super strips, make mini trees, build enclosures for controllers and transmitter. Start sequencing.
Thanksgiving: Turn on the system and make a pact with the wife not to continue to tweek it throughout the month. This is going to be a tough one!.

This has been a marathon hobby for me this whole year. It's taken way more time and money than I thought, but I've also taken on way too much for my first year. That's typical for me though, so at least I'm consistent. Without this forum and the giving spirit of those here I wouldn't have gotten 1/4 the way to where I am. I suppose I'm not sure if I should thank you all or tell my wife it's all "their" fault 🙂 but I can't express my appreciation.

Any input on my planning or lack thereof is greatly appreciated!


Reply
DaveJZ
Posts: 974
(@davejz)
Noble Member
Joined: 16 years ago
OregonLights wrote:I suppose I'm not sure if I should thank you all or tell my wife it's all "their" fault 🙂 but I can't express my appreciation.

Any input on my planning or lack thereof is greatly appreciated!

Blame it on us.... I've blamed all of you for months now.... It's easier to stop listening to complaining by closing out DIYC then to lay in the same bed as a mad wife.

Funny thing is I have not had to close DIYC....


Reply
macebobo
Posts: 1595
Guest
(@macebobo)
Member
Joined: 17 years ago

I thought you had two, front porch AND back porch. 😉

N7XG wrote:Still only at one channel.

Reply
dirknerkle
Posts: 10311
Topic starter
(@dirknerkle)
Illustrious Member
Joined: 18 years ago

I'm DONESVILLE. Now I just have to wait until November to put them all up. :mrgreen:


Reply
Page 6 / 18
Share: