😀 😀 😀 😀 😀 😀 😀 😀 😀 😀
I won't say another word....
kychristmas wrote:1. What is a Fire Stick?
2. How are you doing a talking tree? I'm very interested. The kids would like this, but I don't want to just do a wireframe.Kelly
A fire stick is just a length of either 3/4 or 1 inch pvc with light segments. Mine have 5 segments of 150 lights each. Some may call these by other names. The talking tree is a wire frame Doug made. It is 12 channels. See picture here.
Well about a month ago I posted in here I just started. From then till now. I have 11 songs sequenced 4 new songs. Right now I am at about 32 mins without my voice over. So I may add 1 or 2 more songs did not think I would be done already with sequencing. My 20 4ft mini trees are going to be built in the yard 0%, My 20ft mega tree is going up the day after halloween so 1/2 done just need to string the lights. My 5ft wreath just need to add the lights. Need to test the lights 20% done. Need to buy about 22 100ct red minis and 22 green 100ct minis. Things seem a lot better now. I really want to have my display up by Thanksgiving night since my sister and her family will be here. Never made that mark so we will see.
John
Arches 65%
Mega Tree 100%
Trees 10%
Towers 0%
Controllers 100%
Sequencing 100%
Final wiring.... well we'll see
I do have a stack of PVC pipe laying here....
I've been interested in doing all this for a while, so I finally took the plunge this year. I've had a static display for the past few years, buying up lights that I would need for the invevitable. I currently am working on my 3rd (and final!) renard SS16, and playing around in vixen a bit. I'm trying to start off simple, no wireframes, blowups, blowmolds, and definately no megatrees; just lights. I also recently learned that the version of vixen I am using is prone to bugs and never really made it out of beta, so i'm going to install the latest 2.1 before I try any more sequencing (or hope that 3.0 is out in beta before the start of november and just work with that). Besides, sequencing 48 channels on 4 songs can't take more than a month, right?
Items I have (Reads like a shopping list):
Working Controllers (renard ss16) - 2
Controllers to solder (renard ss16) - 1
FM Transmitter - 1
Cat5 (for rs485) - 600 ft or so
LIGHTS!!
Items ordered, not yet in my posession:
USB to RS-485 converter
SPT2 - 1000 feet
Demarcation Enclosures - 2
Female vampire plugs - 50
Items left to procure:
Demarcation Enclosures - 1
"Tune to" sign - 1
Not sure what I want to do with the tune-to sign, either a north pole with sign, or use corogated plastic with lights. If anyone has any suggestions, my ears are open.
Samj435, if you've already spent a lot of time sequencing in 2.5 and want to go back to 2.1, I believe there is a way to do that. I think that K.C. created a converter to take the file back to the stable version.
At this time of the year, I wouldn't wait for 3.0 if I were you. It'll probably come out in 2012 giving people plenty of time to learn it and sequence for next year.
Well it has been a long hard learning process however it is coming together finally. Today has been a good day my son and I finished 3 10' archs build 4 window frames and I finished tonight two sequence to a point I feel that there show ready. I still need to finish 16 SSRez units buy mounting them in ta200 housing that I hope wlc gets shipped SOON and need to finish my power distro and figure out how to mount my gutter lights. Then of course I have hook all this up and have it running by thanksgiving.
Sent from my Desire HD using Tapatalk
I finally got my star done and tested, it is beautiful.
Have parts for a second but no time this year.
Next project, to make those FAST sticks DANCE.
No new songs this year, all of last year is going to be recycled.
The fireworks and the star are new, that should get their attention.
Joel
Halloween
1 - Coro pumpkin to build (Halloween) - (15%)
8 - RGB Pumpkins (50%)
Christmas
8 - CAKE 16Ch AC Controllers (Done).
4 - Arches (50% Done)
8 - Sparkleballs - (Done)
Backup FM Transmitter - (75%)
Resequence everything - (5%)
Buy a taller ladder - (0%)
This is my first year and with 15 days till Halloween I have tested my renard 24. It blinked so that was great. So far I have gotten it mounted in an enclosure, and I have built my Halloween display which is a 25 foot tunnel built out of pvc, plywood, and black plastic sheathing. With your normal decorations around the entrance. As far as my light controller goes still have to wire all the channels to there cords, water proof the enclosure(I used an electrical box salvaged from an old house),sequence some scary music, and test. After typing all that sounds like I better get to work.
