corytcline
Posts: 1249
(@corytcline)
Noble Member
Joined: 16 years ago

I got my renard working used it during halloween
I have the fmo2 transmitter ordered
dug all the lights out today not near as many as most but its what I got

Still have to hang lights, build an antenna for the transmitter, and finish sequencing at least two more songs, got one completed yesterday.
Also ordered a renw board slowly but surely will be wireless


Reply
dirknerkle
Posts: 10311
Topic starter
(@dirknerkle)
Illustrious Member
Joined: 18 years ago

Dirk's Update ---

Now at about 85% complete. Will be done Monday night...

I love setup time because you get to put put all the stuff out that you've been working on all year. It's tremendously gratifying. 🙂


Reply
klm
Posts: 169
 klm
(@klm)
Estimable Member
Joined: 15 years ago

Handed off all electrical doo dads to electrician at jeeper meeting today.
Made decisions for the lights and how many needed. 1 Member will be buying and looking into how many.
Got another song request...
Set test date to Sat, Nov 19 in an old factory parking lot.
Once we have a good test - I am doing the Happy Dance!


Reply
LabRat
Posts: 2981
(@labrat)
Famed Member
Joined: 17 years ago

LabRat's update.. .

There are LIGHTS on the LAWN!! Day one of setup..

  1. MIDI-Mega tree (conversion of the driveway streetlamp) completed. Cut down the 100 strand strings from last year into 50 lamp strings.
  2. RGBA led flood installed into the driveway lamp-post "bulb". (Perfect for Rudolphs red nose)
  3. 4 arches - installed
  4. Mega Tree guy wires - installed, tested two LED strands spiralling around. (I *LIKE* that blue!!)

Doesn't look like much of a list, but at least there are lights out there. (Yay!)


Reply
Pwmcguire
Posts: 575
(@pwmcguire)
Honorable Member
Joined: 18 years ago

All of this 65 degree weather and sunshine has made for a very comfortable setup, I have got everything on the roof, I just have to make the electrical connections.
The front porch is about 80% setup, still have to make the electrical connections. I Have to start on the yard. I managed to pick up the leaves today, should be the last one for the front yard. My work is slow and we are working 4 days a week so I have friday to setup as well, but no Saturday due to youth football. Everything is going well.


Reply
macebobo
Posts: 1595
Guest
(@macebobo)
Member
Joined: 17 years ago

Finished up the final 2 display elements today.

My tune to sign (with the wrong frequency)

and with the right frequency:

And my wire frame star (Red/White/Blue on - I will use this for 4th of July next year!):

Red:

White:

Blue: (need to splice in a light since the string only had 99 - ugh! - and replace 2 that were dead out of the box!!!)

Except as noted, everything else is DONE! I start setting up next week. I am looking so forward to the season and seeing everyone's videos.

-- John


Reply
dirknerkle
Posts: 10311
Topic starter
(@dirknerkle)
Illustrious Member
Joined: 18 years ago

Nice, John!

Have fun setting up. I think it's one of the most enjoyable parts to the whole experience.

-dave


Reply
Posts: 107
(@hogfather)
Estimable Member
Joined: 17 years ago

Wow, a lot of y'all are ahead of me! I still need to finish my star, figure out how I'm going to make my big tree ornaments (think I have it figured out) and then make them! Still need to get everything out of the attic and make sure it all still works.

Oh, and I have one more song to sequence!

I'll get it done but it's going to be a crazy 3 weeks!


Reply
dirknerkle
Posts: 10311
Topic starter
(@dirknerkle)
Illustrious Member
Joined: 18 years ago

Dirk's update...

At 97%. All that's left is...

** Set out 6 controllers, plug the display items into them and plug into power
** Set out the choir frame (gotta move the boat to get it out)
** Hang 9 strings of lights in a tree.

Would have finished tonite but I get to go to a bible study with Mrs. Dirk instead...

HUGE kudos to my son Ben for helping out so much today. What a trouper!!!


Reply
Posts: 368
(@henkvis)
Honorable Member
Joined: 18 years ago

Hmm, also far ahead for me.
I start the show December 6th. So some days togo.
But roughly I'm at 40-50% of the work what needs to be done. Usually I have the week off in front of the show-start.

So I'm not nervous yet..... I only get nervous of you guys posting things like 97% finished....

Grtz
Henk