The First year is the hardest because your wife doesn't have the "vision" you have. My wife's interest took off when I lit the display and more so as cars started to stop. Be patient is my advice or conduct a test run of a few elements so she can get the vision! But be ready for the criticism ( which is a good thing).
Not my first year of doing lights. Been doing static displays for 10+ years. Got the neighbors all doing it now too. This is the first time of doing it to music though. Starting with 3 Ren 24SS cards. One for myself and one for each of my neighbors.
Finished my archs, wreath, window frames, portable power distro. Mega tree and gutter lights and sequencing a couple more songs.
chesterspot wrote:I got my REN64XC tested this weekend as well as a small 6 channel Halloween show built for proof of concept and testing purposes. My wife noticed that we now have dimming capabilities, there was a slight glimmer in her eye before she moved on to something else. It's the small things! I just need to build the REN24SS for my small tree I want to build and as many SSRez's that I can build. I found out that my hockey puck SSR's cannot be dimmed. While not a major issue, it would've been nice. They'll be for my C9 strings anyway which just line the yard. Anyway that's where I'm at which is good. Now I just need to re-sequence from last year and do another song or two.
I was busy this weekend and got all of my SSRez's built as well as a REN16SS and 24SS. Time to sequence, get my Ethernet to Serial device up and running, and start making pigtails. Man I'm excited!
Dirk's Update....
With the help of Mrs. Dirk and my son, we're about 50% done putting up lights. Would have gotten much further except I had to trim a couple trees, and of course, neighbors stopped by to ask questions, putting me further behind... But it's GOOD that they're asking questions, because maybe they're starting to take an interest!
Still to do:
** Erect the megatree
** Install a frame of lights around the 3rd garage door
** Hang strobes up in a river birch
** Put the tree trunk wraps up
** Put the lighted candy cane wrap around the street light pole
** Erect the net lights over the front bushes
** Set out the choir frame
** Install swag lights above garage doors
** Install 5 wreaths
** Set out two lighted front-entry trees
** Set out the tune-to sign
** String power wire to display pieces
** Set out all the controllers (all wireless) and plug in
Everything's addressed and tested, so I don't anticipate any problems but you just never know... Main Ren-W transmitter and the FM transmitter are working already -- used them for Halloween.
We'll finish up by Monday afternoon and test it out on Monday nite...
I think an UGH!!! is in order
Well I aint no Dirk....but I got my leaping arches out, my north poles out, my C-9's on the roof, my "tune to" sign out, my fm transmitter running and antenna out, my pc set up and running and my controller set out.
Still to do, my icicle lights, my 10 ft tree, my mini trees, my floods and finish sequencing 1 more song, and build several extension cords....
I think I am on track so far...would like to be done by next weekend so I can start running some test sequences and fix any lil quirks before Thanksgiving. First year has been busy but I am so amped up about it CANT WAIT....I can see the blinky flashy in my sleep LOL...no actually I can my wife woke me up the other night when I was pulling on the sheets because I was dreaming I was stringing the C-9's and had the string stuck on the gutter. Thats how it goes when you get this close...GOOD LUCK to all hope your display is moving along also.
I hope to finish my mini trees tomarrow and start getting everything setup next
week and test run next weekend.
I have the first year jitters.
Dirk,
When is first snow?
N7XG wrote:Dirk,When is first snow?
Supposedly later this week... 🙁
Good to see you posting, my friend!