I am at the very beginning of planning/buying for this year. We have a one story house and planning for Megatree, roof outline and some yard stuff.
It is a 1960's ranch style house. We are planning for a new pool and moving our electrical from overhead to underground and also having electrician add some outside dedicated outlets while he is here. To do what we are planning how many outlets and power do you think we would need?
Thanks in advance for any advice.
Which country are you in? I'm guessing US? I can't speak for US regulations.... but for assuming you're running LED pixels you probably don't need anything out of the ordinary. Personally I would have the outlets positioned wherever is going to be convenient for your controller(s). You might also want to run in some data connections while you're at it.
I was recently in a situation like yours. I had a 20 amp switched circuit installed on each end of our home. Well, as my show grew, I found than 20 amps was not enough. I would advise at least 2 20 amp circuits on each end, and have them switched from inside your some if possible. You will be glad in the long run.
Thanks for all the info, I really appreciate it.
Yesterday, the Duke Energy engineer came out and he explained the process of moving service underground.
According to Duke the new code is they will have to move my meter from just outside my backdoor down to a location that is at least 3' from a door or window. That would put the new meter about 40' from its present location to almost the opposite back corner of the house. We are a "gas" home but I am going to go ahead and have 200 amp service installed. The one item they mentioned is that city code says I might have to put a 200 amp disconnect box next to the meter. No big cost with that and they can install 4 20 amp breakers in the disconnect box for outside stuff.
I do have 2 20 outlets in the front on 1 breaker inside. I am thinking to go ahead and have the electrician have a small outlet panel installed and that be a central location for stuff.
Sounds like a fun project!!
I run three 20A circuits for my show. During new construction I put two 20a circuits with some outlets on under the eves and in the yard. I quickly realized I don't want to put a controller under the eves every year (two-story), so they now go unused. They are two "home run" 20a circuits. One runs to a timer switch and GFCI inside the entry closet. The other I have to use plug-in timers on each receptacle. One thing I found, is that GFCI will get more sensitive if you put a lot of load on one circuit. For example, if you have 10 amps on a 20 amp GFCI then the percentage of leakage the GFCI will tolerate is manageable. If you ramp that up to 18a then you may have more leakage which approaches the trigger point.
Sound like splitting hairs? Getting my show to run in the rain has been a master study in GFCI/leakage protection. My show runs fine on two 20a circuits with plenty of headroom but rain would pop my GFCI's. I found that after every single thing I could thing of was done, and I was still tripping infrequently, that splitting the load across two circuits solved the problem. I have to run an extension cord to pick up a third circuit. So GFCI "tolerance" may be a factor to consider.
If I could do it all over again, I would skip the receptacles under the eves. I would run three 20a circuits and put outlets at ground level where needed, and in the yard. All three would run back to the circuit panel in the garage where they would all be activated by a mechanical timer and GFCI protection. My current show functions this way, but it's not as sexy.
Alex
Falcon Pi Player, E1.31 Bridge, Renard and Sandevice Controllers
I installed six 20 amp outlets from a 200amp electric service I installed/upgraded myself. Then I sold the house and moved. How busy is that electrician of yours?
Jeff
2023 Blinky Bound
I moved from 100 to 200 amp service with a disconnect panel on the side which has 4 or 6 (I cant remember) 20 amp breakers installed. One is dedicated to the pool the rest are free. He did not install outlets yet for the other breakers. He said that way he can put outlets where ever I decide later.
OregonLights wrote:Sounds like a fun project!!I run three 20A circuits for my show. During new construction I put two 20a circuits with some outlets on under the eves and in the yard. I quickly realized I don't want to put a controller under the eves every year (two-story), so they now go unused. They are two "home run" 20a circuits. One runs to a timer switch and GFCI inside the entry closet. The other I have to use plug-in timers on each receptacle. One thing I found, is that GFCI will get more sensitive if you put a lot of load on one circuit. For example, if you have 10 amps on a 20 amp GFCI then the percentage of leakage the GFCI will tolerate is manageable. If you ramp that up to 18a then you may have more leakage which approaches the trigger point.
Sound like splitting hairs? Getting my show to run in the rain has been a master study in GFCI/leakage protection. My show runs fine on two 20a circuits with plenty of headroom but rain would pop my GFCI's. I found that after every single thing I could thing of was done, and I was still tripping infrequently, that splitting the load across two circuits solved the problem. I have to run an extension cord to pick up a third circuit. So GFCI "tolerance" may be a factor to consider.
If I could do it all over again, I would skip the receptacles under the eves. I would run three 20a circuits and put outlets at ground level where needed, and in the yard. All three would run back to the circuit panel in the garage where they would all be activated by a mechanical timer and GFCI protection. My current show functions this way, but it's not as sexy.
I envy you about one thing in your neck of the woods, though: you get to test your GFCI a lot. For me, it's like everything is wonderful, until it gets wet. Sometimes it's dry enough that I could just let the show go down when it rains, except it means we can't go out of town over Christmas. Once it trips, it stays tripped, until a human being manually resets it.