I use 36" pieces of 1/2" rebar and drive them down in the ground about 12". I have 3/4" PVC mounted to the back of all my CG1500 and CG2000 boxes. This allows me to slip the CG box right onto the rebar. This also gives me room for snow depths that can at times be 18" in depth by the first of December.
Hockeyhunter1956 wrote:I use 36" pieces of 1/2" rebar and drive them down in the ground about 12". I have 3/4" PVC mounted to the back of all my CG1500 and CG2000 boxes. This allows me to slip the CG box right onto the rebar. This also gives me room for snow depths that can at times be 18" in depth by the first of December.
I used 2 aluminum blocks on the back of my boxes. Drilled a 3/8" hole through the bottom one and halfway through the top one. Then I used a 3/8" aluminum bar for mounting. Really easy to get out of frozen ground. Just used pliers to spin bar breaking loose from frozen ground and it comes right out. Put a marking on rod to indicate how far to drive into ground. Had issue with bar flattening on top when driving into ground but solved that by using another block on top of bar to drive in. Worked like a charm.
Sent from my SM-T710 using Tapatalk
Hockeyhunter1956 wrote:I use 36" pieces of 1/2" rebar and drive them down in the ground about 12". I have 3/4" PVC mounted to the back of all my CG1500 and CG2000 boxes. This allows me to slip the CG box right onto the rebar. This also gives me room for snow depths that can at times be 18" in depth by the first of December.
This looks simple and easy.
I'm sure you already have something figured out, but I use u-posts. They work extremely well.
Controller in ammo box. Rebar + PVC in the ground. Bungee cord holds the ammo box to the PVC.