beeiilll wrote: . . . .
So, did you see the sketch in post #37 - not much difference, and we know the subpanel is code in most areas.
Yes but that drawing does not give all the detail to bring it to specs. The two outlets on the left show a single neutral return for both outlets which is not code. It would need to show the actual wire sizes for the subpanel to main panel and wire sizes to breakers and outlets to allow correct interpretation and whether it is code capable or not.
Subpanel codes can be different in different areas of the country as well.
beeiilll wrote:Yes but that drawing does not give all the detail to bring it to specs. The two outlets on the left show a single neutral return for both outlets which is not code. It would need to show the actual wire sizes for the subpanel to main panel and wire sizes to breakers and outlets to allow correct interpretation and whether it is code capable or not.
Subpanel codes can be different in different areas of the country as well.
Wow, Mr Perfect. Surprised you didn't have a problem with the colors I used.
No need to continue this conversation since talking with you is a one way dead end street.
Its not the colors. It is that you continue to try to use a three wire run with two hot wires and a single neutral. I am an electronics engineer saying it is a bad idea. Beeiilll is an electrician teliing you it is a bad idea. A few others have expressed doubts. I think that is a pretty clear message that this is a bad place to try to save money. The risks for causing a fire or injuring someone would be too high for me to go this route.
MartinMueller2003 wrote:Its not the colors. It is that you continue to try to use a three wire run with two hot wires and a single neutral. I am an electronics engineer saying it is a bad idea. Beeiilll is an electrician teliing you it is a bad idea. A few others have expressed doubts. I think that is a pretty clear message that this is a bad place to try to save money. The risks for causing a fire or injuring someone would be too high for me to go this route.
NEC 201.4(B) allows
More reading http://mjobee.com/projects&news/nec%20art%20210.4.pdf
Look at exhibit 210.1
