51fordf2
Posts: 1280
Topic starter
(@51fordf2)
Noble Member
Joined: 18 years ago
[#7511]

Hi, all. I finally got outside, and did some quick measuring for my mega-tree. I though I would need about 30 foot, or more, but find out that 24 feet, will put me up fairly even with the roof-line. It's a LOT easier to deal with 24 feet, than 30+. I like Frank's telescoping tower, but figure I don't need anything that "stout" (although I'll keep looking for one!!).

I have seen a LOT of these Army Surplus fiberglass and aluminum poles on eBay, in packages or 6, 12, and even 24. There seem to be a few different ones, some being thicker and (presumably) stronger, than others. I have bought 12 of them, of the thicker fiberglass ones.

Here's a link to one-such auction: Fiberglass poles

I'm curious if anyone has used these?? You can buy ring kits that fit on them, for guy-wires, but I will make my own (they get around $30 + shipping for three rings and connectors!). I can't help but think this would make a 24' pole, relatively easy, but would like comments/suggestions from others. I intend to guy it at the top, and the middle, and it will be in the center of my deck, in an umbrella stand.

Thanks in advance,

Roger


20 Replies
Posts: 494
(@tlorek)
Honorable Member
Joined: 18 years ago

Roger,

Kevin (kmc123) used this same system last year for his mega tree. I believe it worked fine for him. He didn't have much of a writeup ( http://www.c3inet.com/ArchesAndTrees/index.htm ), but with proper guy wires, all the weight should be going straight down on the pole, so I don't see why you'd have a problem.


Reply
51fordf2
Posts: 1280
Topic starter
(@51fordf2)
Noble Member
Joined: 18 years ago

Thanks, Tom! I had seen his site, but didn't pick up on that. Looks like his is aluminum, though, not the fiberglass. They have them, too, but they're over $50 for a dozen. I'm thinking you are right - with the right guy wires, top and middle, I won't have any problems. I do like his plate on the top - mine won't come with those. I'll have to make one.

Don't think I'll have the mega-tree this year, Christmas is over half way here, and I ain't half way done! Stringing up arches today...

Thanks,

Roger


Reply
WWNF911
Posts: 1722
(@wwnf911)
Noble Member
Joined: 19 years ago
51fordf2 wrote:Christmas is over half way here, and I ain't half way done! Stringing up arches today...

Dudn it suck... middle of July and already feelin the pressure.


Reply
51fordf2
Posts: 1280
Topic starter
(@51fordf2)
Noble Member
Joined: 18 years ago
WWNF911 wrote:Dudn it suck... middle of July and already feelin the pressure.

Yeah, and funny thing is, when I started sweatin' back in February, a BUNCH of people told me not to get too anxious, or worry...I knew they were wrong...

:o)

R


Reply
kostyun
Posts: 2178
Guest
(@kostyun)
Member
Joined: 20 years ago
51fordf2 wrote:Yeah, and funny thing is, when I started sweatin' back in February, a BUNCH of people told me not to get too anxious, or worry...I knew they were wrong...

:o)

R

Lol - how right you are!!!!


Reply
budude
Posts: 10400
(@budude)
Illustrious Member
Joined: 18 years ago

Shoot - my wife thinks I'm nuts even doing stuff now... so much to do... ARGHHHH!

btw Roger - Maybe ask the seller for the name of the manufacturer so you can get some specs for the poles? The sectional aspect of that is nice so that you can pack the thing away in a reasonable space...


Reply
51fordf2
Posts: 1280
Topic starter
(@51fordf2)
Noble Member
Joined: 18 years ago

Nah...they're military surplus. Hard to tell who makes them. Lots of different ones out there. I'm sure one's the same as the other, the ones I got were the thickest I saw.

R


Reply
Posts: 494
(@tlorek)
Honorable Member
Joined: 18 years ago
51fordf2 wrote:Christmas is over half way here, and I ain't half way done!

Gee, I'm feeling pretty good with where I am.

Let's see...
Mini's are all made (33), 1/3 of them are strung (numerous evenings...can do 2-3/evening)
Arches will be started this weekend, finished mid-next week
Only soldering left is Ren64 (1 evening)
All other controllers are mounted in boxes with extension cords
SSRs still have to be enclosed and wired (16) (2-3 evenings)
Mega Tree hasn't been started, but plan is in place (weekend welding job)
FM antenna has to be made (1 evening)
RDS board *may* get in
Exterior sub panel has to be put in (weekend job)
Make donation box (weekend welding job)
Sign (done, thanks to 99 cent sale!!)
Snowflakes (16) (4-5 evenings)
Window Frames (6) (4-5 evenings)
6 more songs to sequence (woops!!!)

And the sad thing is it's all in MS Project.

You've got plenty of time, Rog!


Reply
51fordf2
Posts: 1280
Topic starter
(@51fordf2)
Noble Member
Joined: 18 years ago

Tom - you're kidding, right??!!??

Multiply by two, and then add a half...I see 6 weeks, by YOUR numbers (with a day off, here and there), so following the formula, that's 15 weeks. Or, just short of 4 months. That would take you into November...

If I had as much as YOU have left, I'd REALLY be sweating!!

Roger, WWAAAAYYYY ahead of Tom!


Reply
Page 1 / 3