Also, when using the calculator to evaluate voltage drop, use 22 AWG wire for the pixel wire. All the manufacturers use 22 or 24 AWG wire. Some vendors specifications claim 18 AWG but I have not found a single source that supplies wire that actually is 18 AWG. RVV injection wires (pigtails, extensions, cable) are a bit better, for claimed wire gauge of 18 AWG, typical actual wire gauge is 19 or 20 AWG. The claimed 18 AWG flat wire is the same as the pixels and typically 22 or 24 AWG.
steve123 wrote:Yeah, that link does not provide the load current. Generally speaking, current = num pixels * 0.06 mA/pixel * intensity (percent). However, you should always plan your wiring and injection based on 100% intensity. So, current = num pixels * 0.06 mA/pixel.
10 years ago it seemed like almost no one ran their pixels at 100% because they were too bright and it seems like that is still the case.
Do you set a threshold that no matter what effect is happening in your show, your pixels are limited to a certain intensity?
It seems overkill to plan for everything to run at 100% intensity when you can change the output power fuses on controllers and install fuses on power supply outputs to lower values if you know that you limit all intensity to say 30%. Which when you run at that max value you may have 40% (random number) less current requirements.
Got it.
I agree that you would likely not run the display at 100% intensity. Some props might run higher than others though depending on the number of pixels and the diffusion. For example, my house outline is primarily direct view pixels and I run those at 30%. My arches are LED strips inside PEX. The PEX diffuses the light quite a bit so I run those at close to 100%.
From a planning perspective, it is important to plan the capacity of the wiring for 100% intensity. That doesn't necessarily mean you have all the power available to run at 100%. But the wiring capacity is important to protect against fault conditions and this means you should use the worst case in the event something goes wrong. It's really a safety issue and I have found that the suppliers are less than reliable about their product specifications and this is another reason for a cautious approach with respect to the wiring. So, plan your wiring so that you do not exceed the capacity of the wire when the strings are at 100% intensity. That way, if there is a fault, your wire insulation should not degrade and lead to other problems.
With regard to the fuses, they are there to protect the wires, not the electronics. More specifically, the wire insulation. The value of the fuse is determined by the capacity of the wire and its' insulation, not the intensity of the LED's. The intensity of the LED's will determine the maximum number you can have on one circuit.
Typically 5A fuses are included with the controllers you buy these days (Falcon, Kulp, etc). That seems like an appropriate value because the "18 AWG" wire supplied by the vendors is not really 18 AWG wire. As mentioned earlier, most pixel and flat wire is 22 to 24 gauge and the RVV is 19 or 20 gauge. The capacity of 22 gauge wire with PVC insulation is 3A. The capacity of 20 gauge wire with PVC insulation is 5A. Ambient temperature plays into this as well. So, if you live in the southern US states, you need to be more mindful of this than say someone living in Alaska.