I have GECE's that I am adding to my display this year. I haven't done anything with pixels and need your insight and opinions what would be the best way to drive these items. The attached picture shows (in red) where the pixels will be going.
All GECE - 25 pixels per strand
The outline of the house will take 11 strands
The arches will take 2 strand each - 6 total strands
The pixel tree will be 12 strands - (I don't plan on customizing the length of the strand for the tree - I will keep it as is)
All windows will consume 4 strands - I will cut some pixels out and add some based on the linear feet, but i will stay below 63 pixels
Bethlehem Star will take 2 strands
I use HLS. based on my plans what would you suggest for controllers? Are there areas that need power injection?
Thanks - Chris
Hope you didn't buy them already!!! What will you control them with??
I know looking at refresh rates on those with E68xx controllers they were horribly slow. If you haven't bought them look at 2801 or 2811's!!
E68x controllers should be good.. Granted the gece's may not be as good as other pixels there's no need to knock them... I use them along with ws2811, Lpd603 to name a few in my display.... Its a Christmas light show, there's no reason to be so critical.....
I run a bunch of GECE's using e682 controllers. You need to think about where you will have the controllers to minimize distance to first pixel and think about power. I have found the GECE's to be pretty good with consistent color up to 50 without injection. But YMMV.
You also need to remember if you go with e682, each cluster must have the same number of pixels. So, if you have 50 pixels in an arch, you cannot connect other pixel lines to that same cluster unless they are also that same length.
I find using the GECE power supplies at the start of each pixel length works really well. Just tie the grounds together and run data all the way from controller to pixel.
I would suggest along the long passes, such as rooflines, you combine the 25 strands to 50 so that you don't use up all your ports in the controllers.
The E682 is a good controller that controls more different pixels than most and one of the few to control the gece. I liked using it for mine this year. komby might be a good bet too.
Here's one way you could do it:
E682: Megatree - 12 ports of 25 length
Arches - 4 ports of 50 length
E6804: Windows/Door - Each window and door has own port. You would have to set them all as the length of the longest one, then have the others just be "wasted" channels and not have pixels there. (This works around the all four being same length issue.)
Not sure how the rooflines are going to be run, but you probably will need 1 to 2 more e682's to cover the roof and the star. You are likely going to have to run a lot of the cabling out that upstairs window to keep things close. Once you get past 5 feet or so, you are looking at either having to inject power or using the GECE power supplies due to voltage drop.
Yeah, the Komby controllers could work well also. They would each handle one universe, but with GECE, that would mean a set of up to 63.
I ran a 581 pixel roof line this year with geces. They worked well for what they are. I did run 4 conductor cable and plugs to each string and used the fourth line to apply voltage to the end of the string. I had strings from 62 pixels to just 15. And longest cable was 29 ft with no null pixel. All white was decent but I plan on upgrading by PC power supply to a mean well and upping voltage.
sent from Captivate running CyanogenMod
Electrified3 wrote:Hope you didn't buy them already!!! What will you control them with??I know looking at refresh rates on those with E68xx controllers they were horribly slow. If you haven't bought them look at 2801 or 2811's!!
Too late, I already purchased them.
duramadmax wrote:I ran a 581 pixel roof line this year with geces. They worked well for what they are. I did run 4 conductor cable and plugs to each string and used the fourth line to apply voltage to the end of the string. I had strings from 62 pixels to just 15. And longest cable was 29 ft with no null pixel. All white was decent but I plan on upgrading by PC power supply to a mean well and upping voltage.sent from Captivate running CyanogenMod
I will have around half the pixels you are using for your roof line. What model of Mean Well are you looking at?
jlowe wrote:Here's one way you could do it:E682: Megatree - 12 ports of 25 length
Arches - 4 ports of 50 lengthE6804: Windows/Door - Each window and door has own port. You would have to set them all as the length of the longest one, then have the others just be "wasted" channels and not have pixels there. (This works around the all four being same length issue.)
Not sure how the rooflines are going to be run, but you probably will need 1 to 2 more e682's to cover the roof and the star. You are likely going to have to run a lot of the cabling out that upstairs window to keep things close. Once you get past 5 feet or so, you are looking at either having to inject power or using the GECE power supplies due to voltage drop.
Yeah, the Komby controllers could work well also. They would each handle one universe, but with GECE, that would mean a set of up to 63.
jlowe - this was exactly what I was looking for (a break down of which controller to each element). Looks like I'm going to go do some research now.
Thanks

