Ok, so I'm planning on building one (maybe 2) mega trees for 2014, aside from size and materials, my question is: is it better to run all of the power lines thru the inside of the pipe/pole or tie wrap it to the outside? I thinking about at least 10 channels or strings maybe more depending on how it looks when finished
Sent from my iPhone using Tapatalk
I personally set mine up with an SS 24 controller at the base of the pole. All power connections on the ground where I can easily get to them. Just used long enough leads from the controller to reach the base ring all around.
I do mine the same as dowis, everything at the base. This was the first year I've had a controller outside of my garage and it seems to have worked just fine! I couldn't see running 24 runs of SPT2 back to my garage from the spiral tree...would have been a HUGE waste!
Do some homework and look at RGB versus standard LED. I have 1 lead to each of my tree's, I way overkilled it with #12AWG but I have 350 RGB's on the small trees with another 50 on the stars. Has been flawless all season and the wiring is so simple. My old spiral trees were a nightmare of extension cords with a controller dedicated to each at the base before, now I can run 4 of them off of 1 RGB controller with 1 cable to each tree. They are so much brighter, can vary the colour and size of the helix on the fly, setup is so much easier, no need to spend time spacing spiral strings, just all around a more versatile method. Software is free, controllers are cheap and RGB's from DIYLEDEXPRESS are the same price if not cheaper than standard C6 LED's.