Just to update everyone.
The BETA PCBs order was submitted this week, i hope to see the boards back in 1-2 weeks. (15 ordered)
I have also ordered the ATMEL ATtiny2313-20PU fro Mouser (25) to cover the BETA testers and some spares.
The BETA testers and board allocations are:
wjohn - 2 Paid
DavidD - 1 Paid
Frank - 1 Paid
kiwi -1 Paid
Marcus - 1 Paid
WildWillie - 1 Paid
nromanel - 1 Paid
santacarl - 1 Paid
rca - 1 Paid
shocker - 1 Paid
scorpia - 1 Paid
Mike Sullivan - 1 Paid
Keith R - 1 Paid
Sat PM Oct 4
The TRICKS-C BETA PC Boards arrived this week while I was away, I will be mailing them ASAP. The uP may follow a day to two later as the parts were delivered to Peter (scorpia) on my behalf. I am only home tonite and back on the road again tomorrow for 10 days.
Peter has done a very able job helping out while I was away during this week, THANKS PETER. Peter has gone thru at least 20$ in gas checking my mail and UPS/DHL deliveries to ensure we got the boards out ASAP.
I just wanted to make sure those who are testing the design get the PCB ASAP, once it is working and reports are back in, I'll post the PDF of the PCB for those interested, and start a formal COOP for the VER 1.0 board (givein that no changes are required), or a VER1.1 if we need to make any minor adjustments.
SUN 5 Oct
Another day, another 12000 miles. I am in Dulles, should be in North Carolina. The uP are in my carry on luggage in Dulles and my luggage is already in North Carolina. Hopefully UA will get me and my bag together tomorrow.
I have posted the BOM, the PCB PDF and the schematic for the V1.0 Beta board. Frank did the tidy up on the post to make it look nice 🙂
Once I get together with my bags, I'll be sending out the PCB and uP to the US/CAN Beta participants. The Aussies will be sent out by Timw and Scorpia this week.
Tues 7 Oct
All the US/CAN boards are in the mail.
BOM
11.0592 MHz Crystal, HC49U case Y1 1
22 pf, 200V NPO Axial Ceramic Capacitors C1,C2 2
.1 uF, 50V, Z5U Axial Ceramic Capacitors C3,C5 2
10 uF, 16V, Radial Aluminum Electrolytic Cap C4 1
Green Transparent LED, 3mm LED1, LED2 2
RS485 Receiver/Transmitter (DIP8) U1 1
ATtiny2313-20PU U3 1
Metal Film Resistor, 1K, 1/4W R4,R5 2
Metal Film Resistor, 470R, 1/4W R1,R8 2
Metal Film Resistor, 27K, 1/4W R6,R7 2
Metal Film Resistor, 10K, 1/4W R2 1
Metal Film Resistor, 120, 1/4W R3 1
Diode, Zener, 4.3V, 0.5W D1 1
Diode, Zener, 9.1V, 0.5W D2 1
Modular Jack, Right-Angle, 8-8 JP1,JP2,JP5 3
Vertical Header, 8 Pin, Dual Row JP3 1
Vertical Header, 6 Pin, Dual Row JP6 1
20 Pin DIP socket (optional) . 1
08 Pin DIP Socket (optional) . 1
**1 ATTINY2313 (should be included in the beta)
Full BOM for Mouser
Paste into Mouser
815-AB-11.0592-B2 1
581-SA102A220JAR 2
581-SA105E104MAR 2
140-XRL16V10-RC 1
604-WP7104GT 2
595-SN65LBC179P 1
556-ATTINY2313-20PU 1
271-1K-RC 2
271-470-RC 2
271-27K-RC 2
271-10K-RC 1
271-120-RC 1
78-1N5229B 1
78-1N5239B 1
571-5520251-4 3
538-10-89-7081 1
538-10-89-7061 1
571-1-390261-6 1
571-1-390261-2 1
ill take 1 or 2 depending on price if you got any left
EDIT: Just noticed the boards probably aren't back yet. (1-2 weeks) Thanks!!!
So how goes the testing? I really hope well, as I'd love to get my hands on 2 of those for this year. My parallel port isn't up to the task of driving my 2 LEDTRIKS boards. (Really cruddy animations and scrolling text.) And I'm using the Parallel port to drive my RDS. (Works great!)
Thanks much for all your work on this. It'll certainly solve some of my scrambled animation problems. I can't wait to hear how it's going!!!
please dont quote me on this but i believe the plan is to have a very short beta testing phase (enough to make sure the boards are good). and then to put out a coop so that the boards can be got back and distrubuted fairly quickly.
the idea as far as i know is to get this out quickly for this christmas. so im pretty sure there will be a coop in the next couple of weeks.
As john is away till the end of next week i would guess the boards will be tested the week after and then the coop started.
so hold tight another couple of weeks and it will all become clear.
Wonderful! Thanks much, and sorry for my impatience.
Just receive my part from mouser, waiting for the pcb 🙂 the iron is red hot
I'm definitely in for two when the group buy begins. I am waiting with baited breath for these little beauties.
EXCELLENT WORK!
OK - Something to add now!
I have built up the first Beta board.
It went together easily and is working well. So far wjohn's layout skills have once again delivered. (thanks John!)
By the weekend I expect the Beta testers will be starting to receive their boards and the intial preprogrammed micros. The beta code is only slightly different from the initial 'show everyone I'm not hiding things to make money' release.
Populating jumper 2 on the board will put it into a diagnostic stand alone mode that tests the Ledtriks with a scrolling pattern and flashes the diag led to show that its running.
The PC program to talk to the TRIKS-C has evolved a bit this week. It now has user selectable com port and the script file function for the commands is working. I will write up a how to install and operate guide and post the executable in the next couple of days so it can be tested.
Thanks to those that have offered support this week. I appreciate it.
Looking forward to seeing how it goes with the rest of the beta boards.
Tim
This is great Tim. Congratulations on a good job.
\dmc
TimW wrote:OK - Something to add now!I have built up the first Beta board.
It went together easily and is working well. So far wjohn's layout skills have once again delivered. (thanks John!)
By the weekend I expect the Beta testers will be starting to receive their boards and the intial preprogrammed micros. The beta code is only slightly different from the initial 'show everyone I'm not hiding things to make money' release.
Populating jumper 2 on the board will put it into a diagnostic stand alone mode that tests the Ledtriks with a scrolling pattern and flashes the diag led to show that its running.
The PC program to talk to the TRIKS-C has evolved a bit this week. It now has user selectable com port and the script file function for the commands is working. I will write up a how to install and operate guide and post the executable in the next couple of days so it can be tested.
Thanks to those that have offered support this week. I appreciate it.
Looking forward to seeing how it goes with the rest of the beta boards.
Tim
so tim when do you expect to have the v1 out
