A build thread...
 
Notifications
Clear all

A build thread...

46 Posts
12 Users
0 Reactions
17.7 K Views
Posts: 77
Topic starter
(@pnewcomb1)
Trusted Member
Joined: 13 years ago
rfallatt wrote:I like this idea...
I currently do
Pre show ... (one or two songs w/voice overs every 30sec) 17:00 to 18:00
Show ... Various 18:00 to 22:00
Post Show ... (one or two songs w/voice overs every 30sec) 22:00 to 24:00

....ooo....i like the voice over idea...thank-you...!

...see this is part of why i decided to do this thread...gawd i love this forum...


Reply
rfallatt
Posts: 648
(@rfallatt)
Honorable Member
Joined: 16 years ago

Voice overs say things like:
"Thank you for coming to see Fallatt's Charlotte Christmas, the show will begin shortly"
Various facts about the show, Charities, number of lights, songs, etc
I use Audacity to do this (took some time to get it but it is relatively easy compared to some of the other stuff we do...lol)


Reply
Posts: 928
(@arw01)
Noble Member
Joined: 13 years ago

Only 1 season ahead of you with the blinky to music part and really had a great time with it. The wifey could care less about the technical side, and the kids think I am obsessed. The wife had a blast taking candy canes out to the kids in the cars and talking to the families and getting all the praise. Me I like just being left alone to tinker.

I would second the cutting back of the pixicles and I think it's good to strive for less is more. Think in groups of 3, 4, 5 for periods in songs that go on and on, you need to be able to vary it up without it being a stroboscopic adventure.

I would add to your list to do while you are planning to watch a few video's a night and keep here on the thread, a list of video's you liked and what segment of the show it was so you can refer back to add ideas to yourself later.

thedementedelf.com does professional voice overs, and being the manager of a big box store you might know someone locally too. I jumped on the lifetime subscription Kevin offered this year to have some voice overs.

I saw a few people mention opening up their inflatibles and putting leds in them to control the lights in those and the colors as well.

So what are you thinking for software? Went LSP myself, most flexibility in controllers, light strings etc.

Alan


Reply
Posts: 2221
(@plasmadrive)
Famed Member
Joined: 15 years ago
pnewcomb1 wrote:This is my vision for the eve/soffit setup on the house. The brackets are undetermined at this point, and the high pixel count "pixcicles" may be a next year addition. My goal is to combinr traditional format of lighting with the movement created by sequencing. Take a look, and offer thoughts...I need to hear if I am crazy...as a matter of fact, I work hard at being crazy...grin.

I just found this tread. Can't read what your drawing says because it is too small, but it looks like you are making a version of the Plasma Icicles I made last year. :happy: Those you are showing will be more dense it seems and are going to suck power like crazy.. Assuming you are using something like WS2812B pixels..

Any chance you can put that drawing up with more readable detail? (larger). If there is anything I can help you with information wise, I would be more than happy to help..

Craig


Reply
Posts: 77
Topic starter
(@pnewcomb1)
Trusted Member
Joined: 13 years ago
arw01 wrote:Only 1 season ahead of you with the blinky to music part and really had a great time with it. The wifey could care less about the technical side, and the kids think I am obsessed. The wife had a blast taking candy canes out to the kids in the cars and talking to the families and getting all the praise. Me I like just being left alone to tinker.

I would second the cutting back of the pixicles and I think it's good to strive for less is more. Think in groups of 3, 4, 5 for periods in songs that go on and on, you need to be able to vary it up without it being a stroboscopic adventure.

I would add to your list to do while you are planning to watch a few video's a night and keep here on the thread, a list of video's you liked and what segment of the show it was so you can refer back to add ideas to yourself later.

thedementedelf.com does professional voice overs, and being the manager of a big box store you might know someone locally too. I jumped on the lifetime subscription Kevin offered this year to have some voice overs.

I saw a few people mention opening up their inflatibles and putting leds in them to control the lights in those and the colors as well.

So what are you thinking for software? Went LSP myself, most flexibility in controllers, light strings etc.

Alan

The voice overs are going to be fun! I think my voice will work, but if I can't stand it, I have a great friend that has kept up his voice training...unlike me... We are both tenor/baritone range, and he can actually work down into the high part of the bass range...specially if i get the 20 year old scotch out...

My software is still up in the air. I suspect I will use Vixen3...have been playing in it, and seem to be able to do what I need to do... That said, only a week or so back I was headed right square into LSP. Had some issues with the trial version, and it doesn't like my SoundForge mixdowns, or my AutoCAD renderings without a big pile of export/import intermediaries....

I am working on a rendering of the eve/soffit assemblies. At this point, i cut the pixciles in half count wise, and those are still subject to cuts. In fact, I may put them off until Christmas 2015 for the reveal. I am getting an idea that I have bitten off more than I can chew for 2014...grin.

Thank-you for the post...and the ideas! I relish all of them, and since my thoughts are very dynamic right now, and not set in stone...this is the time for me to be able to change.


Reply
Posts: 77
Topic starter
(@pnewcomb1)
Trusted Member
Joined: 13 years ago
pythan wrote:I just found this tread. Can't read what your drawing says because it is too small, but it looks like you are making a version of the Plasma Icicles I made last year. :happy: Those you are showing will be more dense it seems and are going to suck power like crazy.. Assuming you are using something like WS2812B pixels..

Any chance you can put that drawing up with more readable detail? (larger). If there is anything I can help you with information wise, I would be more than happy to help..

Craig

Craig...thank-you for the post...yes i need to find a better export file type to move my drawings from AutoCAD to something that photobucket likes...working on it as soon as I can, so stay tuned...the drawings will improve!

I have also cut the pixcicles in half count wise, and may shorten them...that part of the eve/soffit assembly is in constant flux at this point. Some of it may depend on what other elements "have" to be done this year (2014).

Soon I will have a "hard" count of the modules/pixels that will be used in this eve/soffit group of elements, and will probably scare myself with the controller requirements...grin.


Reply
Posts: 77
Topic starter
(@pnewcomb1)
Trusted Member
Joined: 13 years ago

Here is a detail image...and some of it has changed, but this will give you an idea of my general direction...

The 170' coverage has decreased considerably, and the math has changed...

However the modules I want to use are correct in the drawing...I am working toward a "traditional" presentation with "surprising" dynamics...hence the diffused direct view modules.

The gutter is a pvc "c" section gutter...


Reply
Posts: 353
(@bigredsoftware)
Reputable Member
Joined: 15 years ago

Impressive. Beautiful planning so far. Every 3" on the forward ones may still be overkill. Pre-wiring during the remodel sounds perfect as well. I imagine if I had the opportunity I would place an outlet box modified with waterproof connectors that you can get for the pixels. Run heavy gauge power supply wire and use null pixels between boxes if distance becomes an issue. With proper panning you could hang them up, open the box and plug away. All the supply under the roof sounds heavenly. Other side of the coin, do it right and simple the first time, getting back at everything will be a chore, possibly and expensive one :). Redundant data is easy with a backup cat5, I often run 2 when I have to get in hard to reach places, might as well once the fishing line is through. Great project!


Reply
jchuchla
Posts: 8691
(@jchuchla)
Illustrious Member
Joined: 15 years ago

Might I advise, when you have everything open and youre doing your prewire, use conduit. Don't just pull bare wire to plates. Actually install pull boxes and plenty of conduit. You're inevitably going to change things in the future, so give yourself the pathways to add or change cabling. Oversize your conduit so you can stuff more in. Use big pull boxes to give yourself plenty of room to hide things. You wouldnt have to pipe complete runs. You only have to stub the conduit to the attic, or other accessible area inside. The idea is to give yourself a nice easy pull from the sofit to the inside attic where you can hide the rest.
I'm renovating my bathroom at the moment. I have the walls all gutted. I discovered that along the one wall, there's the perfect place to put in pipe chases to connect the upper and lower attics. Thats always been a major roadblock to doing low voltage wiring inside the house. So I put in four 3" pipes that are just stubbed into both attic spaces into a position where they're easy to access from both sides. I did the same thing in the wall behind the toilet. I had access to connect the basement to the upper attic. So another set of pipes went in that wall. Those are actually 20' long. 13' from basement to attic, and another 7' in the attic so it extends to where the roof is high enough that I can comfortably access the stubs.
Here in Chicago, we're no stranger to conduit. All of our electrical wiring is in steel EMT conduit. Its required by code here. And honestly, even though its more expensive and more specialized labor, it does make for very easy changes after the fact. Want a second switchleg for a ceiling fan, just open bith boxes and pull it thru. I did the low voltage stubs in PVC. And in one spot I even used interduct. (Because it was cheap and flexible, but I don't like it). Code here is silent on conduit requirements for low voltage in residential applications. Steel is required for low voltage wiring in commercial work. In the city of Chicago, its even required now to be in blue (or red for fire systems) painted or anodized conduit.

-- Jon Chuchla --

Sent from my iPad using Tapatalk


Reply
Posts: 928
(@arw01)
Noble Member
Joined: 13 years ago
pnewcomb1 wrote:That said, only a week or so back I was headed right square into LSP. Had some issues with the trial version, and it doesn't like my SoundForge mixdowns,

16 bit constant bit rate mp3

That will make LSP happy. After I modified with Audacity, I just used the export function. Obviously Soundforge will do the same.

I suspect, that with the ground up re-write, those bug issues will go away to new ones!


Reply
Page 2 / 5
Share: