30' PVC Mega-Tree
 
Notifications
Clear all

30' PVC Mega-Tree

21 Posts
11 Users
0 Reactions
9,951 Views
Posts: 36
Topic starter
(@mwalz)
Trusted Member
Joined: 13 years ago

Well i came up with a plan i modified from what someone else told me on another forum. Use black steel pipe, at the base slide 1 1/4" black pipe over 3/4" pipe. But between the 2 put a piece of wood or metal to keep it from sinking. Then i would use at least 300lbs guide wire because it will be holding up a little under 100lbs once all the pipe and tree topper is on. Use 16" screw in stakes in the ground, and then raise my lights using a pulley system. I will have 1 20' piece of pipe and one 10' piece instead of 3 separate pieces. What do you guys think?


Reply
Posts: 4092
(@skunberg)
Famed Member
Joined: 18 years ago

I think your on a better track. I would plan on 3 guys or more at the middle and the same amount at the top. You mention less than 100 lbs but your first post said several thousands of lights?

Sent from my SCH-I545 using Tapatalk


Reply
budude
Posts: 10400
(@budude)
Illustrious Member
Joined: 18 years ago

The JUMP/PH needs no guy (not 'guide' btw...) wires. This is important if you don't have the real estate to stake them out from your tree.


Reply
Posts: 98
(@walter-monkhouse)
Estimable Member
Joined: 15 years ago

Mwalz, it is good you are going to use steel instead of PVC. How do you plan to raise up the 30 ft pole, get it vertically level, and hold it in place while the guy wires are installed? Also depending upon the nature of your soil, I would consider guy wire stakes or screw ins of more than 16 inches. If you need guy wires in the middle how will you use a pulley system?


Reply
Posts: 36
Topic starter
(@mwalz)
Trusted Member
Joined: 13 years ago
walter monkhouse wrote:Mwalz, it is good you are going to use steel instead of PVC. How do you plan to raise up the 30 ft pole, get it vertically level, and hold it in place while the guy wires are installed? Also depending upon the nature of your soil, I would consider guy wire stakes or screw ins of more than 16 inches. If you need guy wires in the middle how will you use a pulley system?

Well i will connect the first 2 guy wires, Then i will have one person stabilize the base wile i pull the last 2 guy wires and lift it up. As for the pulley I'm not totally sure, i will have around 48 strands coming off of it plus a topper with a few hundred lights. The frost line here in MO is 2 ft, and Lowes has 16" screw in stakes for $10. I would probably use 4 guy wires from the top. What i could do is use 4 guy wires at 10ft, so i can start the pulley right above that because i have a ladder that can go a lil taller than 10' so i can attach the lights. So then i would have 4 guys at the top, and 4 at the 10' mark. I will use cable somewhat like this:
http://www.amazon.com/Koch-015121-Cable-Construction-Stainless/dp/B002T44RJA/ref=sr_1_1?ie=UTF8&qid=1385603507&sr=8-1&keywords=cable+1%2F8%22steel+cable

And should i connect all 8 guy wires to the same 4 stakes? I fell that would be the easiest way. And i would also have turnbuckles on all of the wires.


Reply