I feel like such an idiot!! Please be kind with your responses. During the past several weeks I've been all through this site until my eyes feel like they are going to bleed and I'm getting a migrane.
I have decided on a Ren ss24. I see there is a coop starting soon and I don't want to miss them. Here is my question. What goes in between the controller and the A/C lights? I see on other boards the controller goes to a SSR but the SS24 already has built in SSR's. What is needed from the output of the terminal strips to the lights, just triacs? Where do I find info on just triac boards, are they called something special?
Thanking you all in advance for your patience with me,
Mike
Mike V. Florida wrote: What is needed from the output of the terminal strips to the lights?Mike
A short extension cord that you can get at the Dollar store with the male plug end cut off, then you can connect a longer extension cord from there to the light string. Some folks make the their own power cord with SPT2 wire and vampire plugs which is up to the user.
You will need to become a supporting member of Diyc in order to join in or post in a group buy thread .
You won't have any regrets with your choice in a ren 24ss , mine is performing like a champ every night running 3 x 7 segment arches.
Good luck with your endeavors .
Cheers
Richard
"You will need to become a supporting member.. "
I just found that out. No problem i'll take care of that once I get home.
"A short extension cord that you can get at the Dollar store with the male plug end cut off, then you can connect a longer extension cord from there to the light string. Some folks make the their own power cord with SPT2 wire and vampire plugs which is up to the user. "
So a "home run" is needed for each string I want to control. The non SS renards have a data line to the SSR and only one A/C cord to the SSR that has the sockets for the strings, right?
External/remote SSR"s will need AC power in (a cut off male end of an ext cord) and power out like a short ext cord with the male end cut off to connect the string of lights to it. It will also need a data cable from the controller to the SSR (cat5 with RJ45 male ends). This setup is mostly used for longer runs and light strings that will not be close to the controller.
Mike V. Florida wrote:"A short extension cord that you can get at the Dollar store with the male plug end cut off, then you can connect a longer extension cord from there to the light string. Some folks make the their own power cord with SPT2 wire and vampire plugs which is up to the user. "So a "home run" is needed for each string I want to control. The non SS renards have a data line to the SSR and only one A/C cord to the SSR that has the sockets for the strings, right?
You can also feed the incoming AC line back out another plug to provide unswitched AC to another SSR (in addition to the 4 switched outputs). This allows you to daisy chain the power line to some degree. Keep in mind that you have to keep an eye on your current usage since the first AC line will be carrying the current back for all the SSRs in the line.
The SS24 is great! That's what I started with myself. Like others have said, all components are self-contained on that board. All you need are cord and plugs coming off the terminals. Then plug the lights into those. I use 2 feet of spt wire with female vampire plugs. Then, based on my light positions, add extension cables or whatever needed from there.
Controllers like the Ren 64 use external SSR's. I do like budude said and daisy chain power together (like all mini trees SSR's connected to same power).
Best of luck!
Here are some pictures to help....
http://www.jamesfamilychristmas.com/index.php?option=com_content&task=view&id=38&Itemid=36
Have you seen the wiki yet.
Here is a good starting point.
http://doityourselfchristmas.com/wiki/index.php?title=7_Steps_to_Selecting_a_Controller
The SS series woulld be included in the decentralized layout.
Joel
