Being my first year doing this, I really underestimated the time involved. I'm still a few days from turning the lights on.
The past 2 1/2 days have been spent running all of the power wires/putting together connectors, something I originally thought I could do in 1 day.
It doesn't help that it snowed about 6 inches between Friday night and yesterday evening.
Anyone else in the same boat?
Been there...done that.... in fact this weekend.
Hang in there.... it will be worth it.
Regards,
Lightman
Every Year.
Your not alone, first year for me aswell and I fell behind getting the display up, all toll it took 4 weekends.
It seems easy at the start and a entire saturday passes and you have 1/4 of the lights up.
Keep going at it, you'll get there 🙂 and seeing your hard work in action will give you tonnes of satisfaction.
Finally..... Everything is set up, except for a few tweaks needed on my FM transmitter... I ended up blowing a fuse on my garage circuit when I plugged everything in (should have switched out more strings for LED's!!!), so I ran a power line for one of my boxes through a wall into the laundry room.
Now I'm sitting in the warm house on my laptop, remote connected to my PC in the garage, playing with my sequences.... THE FUN PART!!!!
Finished setting up the FM02 with coax dipole... VERY impressed with the sound quality and range!!
Finishing up some programming on sequences tonight, but the lights are looped on a few different patterns right now and the cars are already stopping 🙂
