Results 1 to 9 of 9

Thread: scheduler questions

  1. #1
    Join Date
    Jan 2017
    Posts
    113
    Post Thanks / Like

    Default scheduler questions

    I had always planned to start my show Dec 1 (tonight) and somehow I managed to get it all done.

    I read the literature and watched the vid on scheduling . I have created a show with my 3 sequences, with 4 second pauses in between each song. I have created a schedule.
    So here are my questions:
    1) although I enables the shows and enabled the schedule, on the show status scree it says "nothing scheduled..." am I missing something or will that change as the time for the show starts?

    2) when the scheduled time for the show ends, does the program just shut down ( possibly mid song)? or does it end the song and quit?? I have no start up or finish shows.

    Thanks

    Ray

    edit... I am running vixen 3.6 off a laptop (show network) to 2 E682's ( not that that should matter for this thread)

  2. #2
    Join Date
    Oct 2011
    Location
    Maryville, Illinois
    Posts
    1,712
    Post Thanks / Like

    Default Re: scheduler questions

    If it is configured correctly, the up next should indicate when it will start. When the show end time is reached, it will complete the current song and then stop.

  3. #3
    Join Date
    Jan 2017
    Posts
    113
    Post Thanks / Like

    Default Re: scheduler questions

    Quote Originally Posted by jeffu231 View Post
    Ihe up next should indicate when it will start.
    Not sure where that is....
    here is a screen shot.
    schedule.JPG

  4. #4
    Join Date
    Nov 2018
    Location
    Houston, Texas
    Posts
    598
    Post Thanks / Like

    Default Re: scheduler questions

    Had same issue last year and I was forgetting to do something canít remember what but when I get home I can help you out in about an hour if you need.


    Sent from my iPhone using Tapatalk

  5. #5
    Join Date
    Oct 2011
    Location
    Maryville, Illinois
    Posts
    1,712
    Post Thanks / Like

    Default Re: scheduler questions

    Quote Originally Posted by bcer960 View Post
    Not sure where that is....
    here is a screen shot.
    schedule.JPG
    That should show the next time it will run. Ensure the individual schedule you want to run is enabled on the schedule screen and the days, start and end times are correct.

  6. #6
    Join Date
    Jan 2017
    Posts
    113
    Post Thanks / Like

    Default Re: scheduler questions

    Thanks Wilmar

  7. #7
    Join Date
    Jan 2017
    Posts
    113
    Post Thanks / Like

    Default Re: scheduler questions

    Quote Originally Posted by jeffu231 View Post
    That should show the next time it will run. Ensure the individual schedule you want to run is enabled on the schedule screen and the days, start and end times are correct.
    Thanks Jeff,

    Not sure when ( possibly with the files you sent me yesterday) but the dates for the show were for Nov 29. I should have checked that before.

    Thanks again everyone who has helped me get this up and running this year

  8. #8
    Join Date
    Nov 2018
    Location
    Houston, Texas
    Posts
    598
    Post Thanks / Like

    Default Re: scheduler questions

    Lol thatís what I did last year put in wrong year


    Sent from my iPhone using Tapatalk

  9. #9
    Join Date
    Jan 2017
    Posts
    113
    Post Thanks / Like

    Default Re: scheduler questions

    great minds.......

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •