Results 1 to 2 of 2

Thread: FPP scheduler issues

  1. #1
    Join Date
    Jul 2017
    Posts
    21
    Post Thanks / Like

    Default FPP scheduler issues

    I am having issues with what should probably be the easiest thing to configure considering all the other setup I have done. I have some playlists set up in FPP to run the show. There is a segment that runs before the show, the show and then a segment that runs at night to shutdown FPP before the power is shut down via timer. I am not sure what I am doing wrong. This afternoon the scheduler started but froze FPP when it tried to execute the first part. When I ran it manually, it executed just fine. The show had to also be started manually and ran without issue this way. I also noted that if I try to programatically adjust the volume, it also fails. Not sure if anyone else has had that issue

    I am attaching a copy of my schedule. There may have been an easier way to do this and I'm open to suggestions if anyone has a more efficient way to structure this schedule
    Attached Images Attached Images

  2. #2
    Join Date
    Jul 2017
    Posts
    21
    Post Thanks / Like

    Default Re: FPP scheduler issues

    Fyi

    Upgrading my FPP version fixed the issue. I'm thinking there was a bug in 2.1

    Sent from my SM-N960U using Tapatalk

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •