    Overall, looking good. I have a concern about your mains wiring. Most of the posts on this site only deal with US voltages at 120 V. Working with 240 V is a whole different animal and can kill you if not done correctly. I've been following a post on auschristmaslighting.com that talks about some of the requirements for wiring 240 Volts. The power cables need to have a certain type of insulation and need to be at least 50 mm away from lower power cables. In Australia, there is a legal requirement that any 240 Volt wiring needs to be done by a licensed electrician because of the danger of electrocution. Not sure what the requirements are in The Netherlands but I'd check it out if I were you. Sometimes insurance companies won't pay if there is non-approved wiring that causes a fire or personal injury. Here is the link to the Australian site: https://auschristmaslighting.com/for...ic,9563.0.html
    Ow and yeah. 220V hurts like a mofo.
    I've felt that a few times in my life.
    Happy that I've only felt 380V once.

    Yeah I know. It's a bit different here.
    Not too worried about it though.
    This is something I did myself aswell.

    _20170309_193144.jpg

    Main powerboard for the entire house.
    With some help ofcourse. But still...

    And other projects outside aswell.
    Last edited by Sammy2004; 03-09-2017 at 02:39 PM.

  2. #102
    Join Date
    Jan 2016
    Location
    West Bloomfield, MI
    Posts
    96
    Post Thanks / Like

    Default Re: Startup Project - Leaping Arches

    Looks like you have it handled.

    Sent from my SM-G935V using Tapatalk

  3. #103
    Join Date
    Jan 2017
    Location
    Netherlands, Lochem
    Posts
    102
    Post Thanks / Like

    Default Re: Startup Project - Leaping Arches

    Quote Originally Posted by ezellner View Post
    Looks like you have it handled.

    Sent from my SM-G935V using Tapatalk
    I hope so.
    It's just ALOT of new info. So good to start with only the leaping arches this year. And then expand a bit next year.

  4. #104
    Join Date
    Jan 2016
    Location
    West Bloomfield, MI
    Posts
    96
    Post Thanks / Like

    Default Re: Startup Project - Leaping Arches

    I know what you mean. I started last year year with a 10 foot pixel tree (without any music sync) plus all my other always-on LED lights. I worked on it in bits and pieces all last year but it was ready to go when I put it all together in late November. It worked the first time. This year I'm expanding my pixel count to 4 times what I had last year (800 to 3250) with house outline, window outlines, ten mini-trees and 5 arches in addition to the pixel tree. All will be synced to music. It's really good that you are starting early because some of this takes a lot of time both to learn and to do.

  5. Likes Sammy2004 liked this post
  6. #105
    Join Date
    Jan 2017
    Location
    Netherlands, Lochem
    Posts
    102
    Post Thanks / Like

    Default Re: Startup Project - Leaping Arches

    Second junction box.
    Will supply the regular led fairy strings.
    And the raspberry Pi.
    Also current to the controller/powersupply box will come from here.

    _20170314_163859.jpg

  7. #106
    Join Date
    Jan 2017
    Location
    Netherlands, Lochem
    Posts
    102
    Post Thanks / Like

    Default Re: Startup Project - Leaping Arches

    Enclosure which will distribute all wires to fairy strings and to the other enclosure box is done. Sofar.....
    And mounted the temp controller in my enclosure box which hold the powersupplies and the future e682's.

    _20170318_133057.jpg

    _20170318_133124.jpg

    Now have to order e682.
    And install my security camera outdoors.

    Plenty of time.

    When weather gets better I'll prep for bending the tubes.
    Gna be exciting. Lol. Scared to fuck it up though.

  8. #107
    Join Date
    Jan 2016
    Location
    West Bloomfield, MI
    Posts
    96
    Post Thanks / Like

    Default Re: Startup Project - Leaping Arches

    We all make mistakes as part of the learning process. Most are minor and easily remedied.

    Sent from my SM-G935V using Tapatalk

  9. #108
    Join Date
    Jan 2017
    Location
    Netherlands, Lochem
    Posts
    102
    Post Thanks / Like

    Default Re: Startup Project - Leaping Arches

    Enclosure which will distribute all wires to fairy strings and to the other enclosure box is done. Sofar.....
    And mounted the temp controller in my enclosure box which hold the powersupplies and the future e682's.
    Added the outgoing wires. Will connect all pigtails to the fairy strings so i can easy connect and disconnect those to the enclosure.

    _20170321_170838.jpg

  10. Likes ezellner liked this post
  11. #109
    Join Date
    Jan 2017
    Location
    Netherlands, Lochem
    Posts
    102
    Post Thanks / Like

    Default Re: Startup Project - Leaping Arches

    Excited.

    E682 order placed.

  12. Likes ezellner liked this post
  13. #110
    Join Date
    Jan 2017
    Location
    Netherlands, Lochem
    Posts
    102
    Post Thanks / Like

    Default Re: Startup Project - Leaping Arches

    Quote Originally Posted by Sammy2004 View Post
    Excited.

    E682 order placed.
    E682 received.
    Got it working in test mode now.
    Now I need to figure out how to get sequence onto sd card and how to make it run through raspberry pi